Steel Pipe FAQ — Standards, Grades, Ordering & Delivery
Find straightforward answers about our manufacturing capabilities, quality assurance, shipping, and payment policies.
Sales & Orders
For standard steel pipes (API 5L, ASTM A53) in common sizes, our MOQ is typically 25 Metric Tons, which corresponds to one full 20ft container.
However, if you require customized specifications, non-standard wall thicknesses, or specialized coatings like 3LPE, the MOQ may increase to 50-100 Tons depending on the production run requirements. Please contact our sales team for exact details based on your dimension.
We offer flexible payment terms for our international B2B clients:
- T/T (Telegraphic Transfer): 30% advance payment upon order confirmation, and 70% balance against the copy of the Bill of Lading (B/L).
- L/C (Letter of Credit): 100% Irrevocable L/C at sight from a first-class international bank.
Yes, we can provide small cut pieces of our steel pipes (approx. 15-20cm) as free samples for your quality evaluation. The client is only responsible for the international courier freight cost (DHL/FedEx). This freight cost can be deducted from your first official order.
Production & Quality Control
Our standard production and delivery time is 15 to 30 days after receiving the advance payment or original L/C, depending on the order volume.
For urgent projects or standard sizes available in our inventory stock (over 50,000 tons available), we can mobilize and load to the port within 7 days.
Absolutely. We strongly welcome and frequently cooperate with international third-party inspection agencies such as SGS, BV, DNV, TUV, and Intertek.
Clients can arrange their preferred agency to inspect the pipes at our mill before loading. All inspection costs are generally borne by the buyer unless otherwise negotiated.
With every shipment, we provide a complete Mill Test Certificate (MTC) in accordance with EN 10204 3.1. If a third-party inspection is involved, an EN 10204 3.2 certificate can also be issued.
The MTC includes chemical composition, mechanical properties (yield strength, tensile strength), hydrostatic test results, and Non-Destructive Testing (NDT) reports.
Logistics & Shipping
To ensure pipes arrive without damage, we use rigorous seaworthy packaging:
- Small OD Pipes: Bundled with heavy-duty steel strips.
- Large OD Pipes: Shipped loose, with plastic caps protecting the beveled ends.
- Coated Pipes (e.g., 3LPE): Wrapped with nylon ropes or padded slings during loading to prevent coating damage, often shipped with wooden dunnage.
Our manufacturing facility sits in Zhifangtou Industrial Park, Cangzhou, Hebei — about 120 km by road from Tianjin Port (Xingang), the largest comprehensive port in Northern China, and around 80 km from Huanghua Port. This allows us to cut inland transportation costs and keep vessel loading on schedule.
Still Have Questions?
Our technical sales engineers are online 24/7 to assist with your pipeline specifications.