Steel Pipe Weight Calculator
Weight per metre, per foot and per order — from Nominal Pipe Size, schedule, wall thickness and material. Built on the same ASME B36.10M wall thickness table we manufacture to.
Pipe weight calculator form
Duplex, super duplex and 6Mo sit around 7.80–7.85; cast iron around 7.20.
Selecting a size and schedule fills in the standard dimensions. OD and wall thickness can both be overwritten for non-standard sizes, line pipe above 24 inch, or project-specific wall thickness.
- Weight per foot
- 24.30 kg/ft
- Weight per piece
- 956.8 kg
- Total weight
- 956.8 kg
- Inside diameter
- 303.28 mm
- Wall thickness
- 10.31 mm
- Outside diameter
- 323.9 mm
Theoretical weight at nominal dimensions. Not for lifting or shipping calculations — see the tolerance note below.
How Steel Pipe Weight Is Calculated
Pipe weight is not driven by the pipe's overall diameter. It is driven by the cross-section of the steel wall. A pipe is a hollow cylinder, so the material volume in one metre of length equals the area of that annular steel ring multiplied by the length. Multiply again by density and you have the weight.
W (kg/m) = (π/4) × (OD² − ID²) × ρ / 1000
Here OD and ID are the outside and inside diameters in millimetres, and ρ is the material density in g/cm³. Since ID = OD − 2t, where t is the wall thickness, the expression simplifies to a form that only needs the two dimensions printed on any pipe tag:
W (kg/m) = π × t × (OD − t) × ρ / 1000W (kg/m) = 0.02466 × t × (OD − t) (carbon steel, ρ = 7.85)
The coefficient 0.02466 is simply π × 7.85 / 1000. It is not a standard value that anyone published; it is arithmetic. Change the density and the coefficient changes with it — which is why a stainless pipe of identical dimensions weighs about 2% more than a carbon steel one.
Worked example: 12 inch Schedule 40
Take a 12 inch nominal pipe. ASME B36.10M fixes its outside diameter at 323.9 mm regardless of schedule. Schedule 40 gives a wall thickness of 10.31 mm.
W = 0.02466 × 10.31 × (323.9 − 10.31) = 0.02466 × 10.31 × 313.59 = 79.73 kg/m
Converted to imperial that is 53.58 lb/ft. In the Gulf and Southeast Asia the same number is often quoted as 24.30 kg/ft — feet for the length, kilograms for the price — which is why the result panel shows both per-foot figures rather than forcing a conversion. Twelve metres of it — one standard length — comes to 956.8 kg, which is the number a shipping clerk actually needs.
The imperial formula
In inches and pounds the same arithmetic produces a different coefficient. With t and OD in inches, the result in lb/ft is:
W (lb/ft) = 10.69 × t × (OD − t)
Both coefficients are exact restatements of the same physical relationship, so a correctly rounded metric and imperial answer will always agree to within the last decimal place.
Why the Schedule Number Alone Does Not Fix the Weight
Two pipes can both be called “12 inch” and differ in weight by a factor of six. Schedule is a wall thickness series, and the wall is where all the steel is.
| NPS | Schedule | OD (mm) | Wall (mm) | Weight (kg/m) |
|---|---|---|---|---|
| 12" | SCH 10 | 323.9 | 4.57 | 35.99 |
| 12" | SCH 40 | 323.9 | 10.31 | 79.73 |
| 12" | SCH 80 | 323.9 | 17.48 | 132.09 |
| 12" | SCH 160 | 323.9 | 33.32 | 238.78 |
Same outside diameter, same nominal size, same material — and the heaviest option is 6.6 times the lightest. On a 5 km pipeline that is the difference between 1,800 tonnes and 11,900 tonnes of steel. This is why a weight enquiry without a schedule is not an enquiry yet.
There is also a trap worth knowing. For 8, 10 and 12 inch pipe, XXS is thinner than SCH 160 — 22.23 mm against 23.01 mm at 8 inch, for instance. XXS is not the top of the series at every size. If you are costing the heaviest available wall, check the table rather than assuming the last column is the maximum.
Material Density Changes the Answer
The geometry term is fixed by the dimensions. The only remaining variable is density, and it moves less than most buyers expect — until it does not.
| Material | Density (g/cm³) | vs carbon steel |
|---|---|---|
| Carbon steel (A106, API 5L) | 7.85 | — |
| Alloy steel, Cr-Mo (A335) | 7.85 | 0% |
| Stainless 304 / 304L | 7.93 | +1.0% |
| Stainless 316 / 316L | 8.00 | +1.9% |
| Aluminium | 2.70 | −65.6% |
A 1.9% difference looks like rounding on a single pipe. On a 1,000 tonne stainless order it is 19 tonnes of material, which is the difference between a good and a bad quotation. Note also that duplex and super duplex grades sit higher still, around 7.80 to 7.85 g/cm³ depending on grade — close enough to carbon steel that the same coefficient is usually acceptable for estimating.
Grades outside this list can be entered directly. Choose Custom density in the material field and type the figure from the mill certificate or the material standard — 904L at 8.24, 6Mo at 8.00, cast iron at 7.20. The arithmetic is unchanged; only the density term moves. This matters when a purchase order is written against a specific grade and the buyer needs the theoretical weight to match the certificate rather than a rounded catalogue figure.
Reference Weight Chart for Common Sizes
The table below gives theoretical weight for the sizes we quote most often. All values are calculated for carbon steel at 7.85 g/cm³ using nominal wall thickness.
| NPS | DN | Schedule | OD (mm) | Wall (mm) | kg/m | lb/ft |
|---|---|---|---|---|---|---|
| 1/8" | 6 | SCH 40 | 10.3 | 1.73 | 0.37 | 0.25 |
| 1/4" | 8 | SCH 40 | 13.7 | 2.24 | 0.63 | 0.43 |
| 3/8" | 10 | SCH 40 | 17.1 | 2.31 | 0.84 | 0.57 |
| 1/2" | 15 | SCH 40 | 21.3 | 2.77 | 1.27 | 0.85 |
| 3/4" | 20 | SCH 40 | 26.7 | 2.87 | 1.69 | 1.13 |
| 1" | 25 | SCH 40 | 33.4 | 3.38 | 2.50 | 1.68 |
| 1-1/2" | 40 | SCH 40 | 48.3 | 3.68 | 4.05 | 2.72 |
| 2" | 50 | SCH 40 | 60.3 | 3.91 | 5.44 | 3.65 |
| 2" | 50 | SCH 80 | 60.3 | 5.54 | 7.48 | 5.03 |
| 3" | 80 | SCH 40 | 88.9 | 5.49 | 11.29 | 7.59 |
| 3" | 80 | SCH 80 | 88.9 | 7.62 | 15.27 | 10.26 |
| 4" | 100 | SCH 40 | 114.3 | 6.02 | 16.08 | 10.80 |
| 4" | 100 | SCH 80 | 114.3 | 8.56 | 22.32 | 15.00 |
| 6" | 150 | SCH 40 | 168.3 | 7.11 | 28.26 | 18.99 |
| 6" | 150 | SCH 80 | 168.3 | 10.97 | 42.56 | 28.60 |
| 8" | 200 | SCH 20 | 219.1 | 6.35 | 33.32 | 22.39 |
| 8" | 200 | SCH 40 | 219.1 | 8.18 | 42.55 | 28.59 |
| 10" | 250 | SCH 40 | 273.1 | 9.27 | 60.31 | 40.53 |
| 12" | 300 | SCH 10 | 323.9 | 4.57 | 35.99 | 24.18 |
| 12" | 300 | SCH 40 | 323.9 | 10.31 | 79.73 | 53.58 |
| 12" | 300 | SCH 80 | 323.9 | 17.48 | 132.09 | 88.76 |
| 16" | 400 | SCH 40 | 406.4 | 12.70 | 123.31 | 82.86 |
| 24" | 600 | SCH 20 | 610 | 9.53 | 141.12 | 94.83 |
| 24" | 600 | SCH 40 | 610 | 17.48 | 255.43 | 171.64 |
Why Your Calculated Weight Will Not Match the Weight Ticket
The calculator returns theoretical weight: nominal wall, nominal diameter, nominal density. Real pipe never sits exactly on nominal, and the difference has a documented size.
API 5L permits the weight of a single length to deviate from theoretical by −3.5% to +10%, and the weight of a carload or truckload by −1.75% to +10%. The asymmetry is deliberate: mills are allowed to be generous with wall thickness because extra wall is extra steel the buyer receives.
Two consequences follow. Use the calculated figure for budgeting, freight estimation and structural dead load, always with the tolerance applied in the direction that hurts you. Use the actual weighed figure — the one on the packing list and the mill certificate — for lifting plans, container loading and final invoicing. On a 25 tonne lift, a 3.5% error is 875 kg, which is not a rounding detail.
Coating compounds the gap. FBE at 350 to 450 microns adds a fraction of a percent and can be ignored. Three layer PE or PP at 3 mm nominal on a 12 inch pipe adds roughly 3 to 5 kg per metre, which is 4 to 6% on top of a Schedule 40 weight. If you are ordering coated line pipe by weight, ask for the coated weight rather than adding your own allowance.
Using This Calculator in a Real Enquiry
A weight figure on its own will not get you a firm price, because weight is only one of four inputs the mill needs. When you send an enquiry, include:
- Standard and grade — API 5L X70M PSL2 is a different price from ASTM A106 Grade B, even at identical dimensions
- NPS, schedule or exact wall thickness — and length, since 11.8 m and 12 m are not interchangeable for some projects
- Quantity in pieces or tonnes — mills quote both, and the two do not always round to the same order
- Coating and end finish — bare, 3LPE, FBE, galvanized, bevelled or plain end
- Inspection and documentation — MTC 3.1, third party inspection, hydrostatic test pressure
With those five, we can come back with a firm weight and a firm price rather than a range.
Frequently Asked Questions
How do you calculate the weight of a steel pipe?
Multiply the cross-section of the steel wall by the length and the density. For carbon steel with dimensions in millimetres the working formula is W (kg/m) = 0.02466 × t × (OD − t). The coefficient is π multiplied by 7.85 and divided by 1000, so it changes if the material changes.
What is the weight of a 12 inch Schedule 40 steel pipe?
79.73 kg per metre, or 53.58 lb per foot. That is at the standard outside diameter of 323.9 mm and a wall of 10.31 mm. One 12 metre length weighs about 957 kg.
Is pipe weight calculated per metre or per foot?
Both, and the conversion is 1 kg/m = 0.67197 lb/ft, or 1 kg/m = 0.3048 kg/ft. This calculator shows both per-foot figures at once because purchase orders from different regions use different conventions — lb/ft in North America and the UK, kg/ft in the Gulf and parts of Southeast Asia where the length is in feet but the price is per kilogram. A mismatch between them is a common source of quantity disputes.
Why does my calculated weight differ from the shipping document?
Theoretical weight assumes nominal wall and nominal density. API 5L allows a single length to run from −3.5% to +10% of theoretical, and coating adds weight the formula does not include. The shipping document is based on actual weighing, so it is the authoritative figure for freight and invoicing.
Can I use this for square or rectangular tube?
Not directly. Hollow sections use a different geometry term: W (kg/m) = 0.0157 × t × (A + B − 2t) for a rectangular section with outside dimensions A and B in millimetres. The density coefficient is the same idea, but the perimeter term replaces the circumference.
Related Specifications
The wall thickness data behind this calculator comes from our full steel pipe schedule chart, which covers every schedule from SCH 10 to XXS across 1/8 to 24 inch with both millimetre and inch values. If you are selecting a pipe rather than weighing one, the seamless pipe manufacturing guide explains how the schedule is held in production, and the ERW pipe guide covers the wall ranges available in welded product.
For the products these figures apply to: seamless steel pipe, ERW steel pipe, LSAW steel pipe and SSAW steel pipe.