Foundation Pit Supporting Structure
UAE · 2025 · Large-diameter LSAW pipe for deep excavation shoring
- Volume550 MT
- Diameter914–1422 mm
- GradeS355JR
- StandardEN 10219
The requirement
A foundation pit supporting structure project in the UAE required large-diameter steel pipe to serve as permanent retaining elements for a deep excavation. The pipe would be driven as king piles and braced with lagging, holding back soil and groundwater for the duration of the basement construction cycle.
The EN 10219 S355JR specification was selected for its guaranteed minimum yield strength of 355 MPa and its suitability for structural applications in hot climates. The diameter range — 914 mm to 1422 mm — was determined by the excavation depth and lateral soil pressure at each section of the pit perimeter.
Scope of Supply
| Product | LSAW structural pipe, JCOE formed |
|---|---|
| Standard | EN 10219 |
| Grade | S355JR |
| Outside diameter | 914 mm to 1422 mm (multiple sections) |
| Wall thickness | Per structural design, 12–20 mm range |
| Length | 12 m nominal, cut to project requirements |
| Pipe ends | Square cut, weld prep per contractor detail |
| Straightness | ≤ L/1000, checked on roller bed end to end |
| Surface | Bare steel; anti-corrosion primer optional |
| Weld inspection | 100% UT on the longitudinal seam |
| Documentation | EN 10204 3.1 certificates, dimensional log per piece |
| Total quantity | 550 MT |
How It Was Manufactured
Plate selection
S355JR plate rolled for multiple diameters, with chemistry verified against EN 10219 requirements and carbon equivalent controlled for site welding.
JCOE forming and welding
Plate crimped, J-formed and O-pressed, then SAW welded inside and outside. Mechanical expansion ensures ovality stays within EN 10219 tolerance.
Straightness check
Each length checked on a roller bed with gauges at mid-span and quarter points. Out-of-tolerance joints are reworked before release.
End prep and marking
Square cut, weld prep applied, piece number and length stencilled for the contractor to match to the pile layout plan.
Delivery Schedule
Order confirmed
Structural drawings and diameter schedule approved with the foundation contractor.
Production
Multiple diameter sizes produced in sequence, with S355JR chemistry verified per heat.
Inspection
100% UT on weld seams, dimensional check, straightness verified on roller bed. EN 10204 3.1 certificates issued.
Shipment
Loaded and shipped to the UAE project site, coordinated with the excavation timeline.
What Made the Difference
- Multiple diameters from one mill. Producing 914 mm to 1422 mm pipe in a single order — with consistent EN 10219 S355JR chemistry across all sizes — eliminated the need for a second supplier and the interface risk that comes with it.
- Straightness for driven piles. Foundation pit king piles must hold alignment under lateral soil pressure. Every joint was logged on a roller bed so the contractor could verify compliance without re-inspection on site.
- Weldability in high temperatures. Carbon equivalent controlled and reported per heat so that field welding of splice connections could proceed without preheat adjustment in the UAE's high ambient temperatures.
Related Work
Other case studies
Technical guide
Browse all project case studies · the steel pipe FAQ.
Need pipe for a foundation pit?
Send us the excavation depth, soil report and diameter schedule — we will confirm wall thickness and grade for your shoring design.